Project Management

Construction Management or Construction Project Management (CPM) is the overall planning, coordination, and control of a project from beginning to completion.  CPM is aimed at meeting a client’s requirement in order to produce a functionally and financially viable project.  The construction industry is composed of five sectors: residential, commercial, heavy civil, industrial, and environmental.  A construction manager holds the same responsibilities and completes the same processes in each sector.  All that separates a construction manager in one sector from one in another is the knowledge of the construction site.  This may include different types of equipment, materials, subcontractors, and possibly locations.

The design stage contains a lot of steps: programming and feasibility, schematic design, design development, and contract documents.  It is the responsibility of the design team to ensure that the design meets all building codes and regulations.  It is during the design stage that the bidding process takes place.

  • Conceptual/Programming and feasibility: The needs, goals, and objectives must be determined for the building.  Decisions must be made on the building size, number of rooms, how the space will be used, and who will be using the space.  This must all be considered to begin the actual designing of the building.
  • Schematic design: Schematic designs are sketches used to identify spaces, shapes, and patterns. Materials, sizes, colors, and textures must be considered in the sketches.dual-use-tank-schematic
  • Design development (DD): This step requires research and investigation into what materials and equipment will be used as well as their cost.
  • Contract documents (CDs): Contract documents are the final drawings and specifications of the construction project. They are used by contractors to determine their bid while builders use them for the construction process. Contract documents can also be called working drawings.

Pre-construction

The pre-construction stage begins when the owner gives a notice to proceed to the contractor that they have chosen through the bidding process.  A notice to proceed is when the owner gives permission to the contractor to begin their work on the project.  The first step is to assign the project team which includes the project manager (PM)contract administratorsuperintendent and field engineer.

  • Project manager: The project manager is in charge of the project team.fiberglass-cistern
  • Contract administrator: The contract administrator assists the project manager as well as the superintendent with the details of the construction contract.
  • : It is the superintendent’s job to make sure everything is on schedule including flow of materials, deliveries, and equipment. They are also in charge of coordinating on-site construction activities.
  • Field engineer: A field engineer is considered an entry-level position and is responsible for paperwork.

During the pre-construction stage, a site investigation must take place. A site investigation takes place to discover if any steps need to be implemented on the job site. This is in order to get the site ready before the actual construction begins. This also includes any unforeseen conditions such as historical artifacts or environment problems. A soil test must be done to determine if the soil is in good condition to be built upon.

Procurement

The procurement stage is when labor, materials and equipment needed to complete the project are purchased.  This can be done by the general contractor if the company does all their own construction work. If the contractor does not do their own work, they obtain it through subcontractors.  Subcontractors are contractors who specialize in one particular aspect of the construction work such as concrete, welding, glass, or carpentry.  Subcontractors are hired the same way a general contractor would be, which is through the bidding process.  Purchase orders are also part of the procurement stage.

  • Purchase orders: A purchase order is used in various types of businesses. In this case, a purchase order is an agreement between a buyer and seller that the products purchased meet the required specifications for the agreed price.

Constructionscreen-shot-2016-11-06-at-12-42-26-pm

The construction stage begins with a pre-construction meeting brought together by the superintendent.  The pre-construction meeting is meant to make decisions dealing with work hours, material storage, quality control, and site access.  The next step is to move everything onto the construction site and set it all up.

At this stage, construction monitoring and supervision is of great importance to ensure that a project is completed on time and on budget, while meeting all relevant regulations and quality standards.

Contractor progress payment schedule

Contractor progress payment schedule is a schedule of when (according to project milestones or specified dates) contractors and suppliers will be paid for the current progress of installed work.

Progress payments are partial payments for work completed during a portion, usually a month, during a construction period. Progress payments are made to general contractors, subcontractors, and suppliers as construction projects progress. Payments are typically made on a monthly basis but could be modified to meet certain milestones. Progress payments are an important part of contract administration for the contractor. Proper preparation of the information necessary for payment processing can help the contractor financially complete the project.